How to Deprioritize a Package Getting Assigned to Existing Visits
Posted by
Support Team
on
May 14, 2025
— Updated on
June 12, 2025
This guide will walk you through the process of deprioritizing a package from being assigned to existing visits.
1. Schedule
Click the Schedule tab to reveal the additional options beneath it.

2. Packages
Click on the packages tab.

3. Edit Package
Locate a package and click the edit icon.

4. Deprioritize Package
Scroll down, go to advanced settings and select the “Deprioritize Package” checkbox. If enabled, this package will be deprioritized when applying to visits and package limit restrictions.

5. Save Package
Click the save package button to save the changes made to the package.

The guide demonstrated how to deprioritize a package.